Trade Association, Head Office
Location
Bolzano, ItalyArchitect
De man deBolzano and Padua
Italy
Data
Overall Project Time:2000 - 2002
Execution Period:
10 Months
Scope of work
- Glass facades, mainly executed as transom / mullion constructions.
- Glass sun protection system.
- Roof glazing.
Innovations / Challenges
- Cable-suspended, point-fixed sun protection system.
Ground Floor:
- frameless, floor-to-ceiling triple glazing.