Hanse Hotel Attendorn
Hanse Hotel Attendorn
Hanse Hotel Attendorn
Hanse Hotel Attendorn
Hanse Hotel Attendorn

Hanse Hotel Attendorn

Location

Attendorn, Germany

Architect

Maximo Victoria Architects
Düsseldorf, Germany

Data

Overall Project Time:
8 Months

Execution Period:
September 2011 – April 2013

Scope of work

  • 190 m2 entrance facade.
  • Windows: 570 linear metres of ribbon window.
  • 164 linear metre ground floor facade with integrated doors in minimo_FR system
  • 157 m2 round roof glazing, filigree canopy.

Innovations / Challenges

  • Highly thermally-insulated curved metal / glass facade in minimo_FR transom / mullion system with aesthetically minimised face width for maximum transparency.
 
« Back to project description