Sporthaus Karstadt, Glass Bridge
Location
Dortmund, GermanyArchitect
Christian F. HeineHamburg, Germany
Data
Overall Project Time:2002
Execution Period:
6 Months
Scope of work
- Glass bridge construction: 13m glazed connecting footbridge.
- Complete steel load-bearing bridge structure.
- Bridge glazing, structural horizontal and vertical glass fins.
- Glass floor with anti-slip coating.
- Stainless steel and glass passage-way.
- Various other stainless steel elements.
Innovations / Challenges
- Undercut anchors.
- All-glass bridge including structural elements.
- Floor slab as welded grating.