Mechanised folding, perforated screens - Gasholders London - FRENER & REIFER
Adaptive Building Envelope - Gasholders London - FRENER & REIFER
Special facades - Gasholders London - FRENER & REIFER
full height triple glazing - Gasholders London - FRENER & REIFER
Special facades and triple glazing - Gasholders London - FRENER & REIFER
Special facades and triple glazing1 - Gasholders London - FRENER & REIFER
Connecting bridges between the Buildings - Gasholders London - FRENER & REIFER
Connecting bridges between the Buildings 1 - Gasholders London - FRENER & REIFER
Connecting bridges - Gasholders London - FRENER & REIFER
Steel balconies with glass balustrades - Gasholders London - FRENER & REIFER
Glass roofs - Gasholders London - FRENER & REIFER
Glass roof - Gasholders London - FRENER & REIFER
Glass roof 1 - Gasholders London - FRENER & REIFER
Glazed courtyards - Gasholders London - FRENER & REIFER
Motorised sliding roofs - Gasholders London - FRENER & REIFER
3b - Gasholders London - FRENER & REIFER
Unitised facades with front-mounted sheet metal facades - Gasholders London - FRENER & REIFER
sheet metal facades - Gasholders London - FRENER & REIFER
3a - Gasholders London - FRENER & REIFER
3 - Gasholders London - FRENER & REIFER
Motorised concertina blinds - Gasholders London - FRENER & REIFER
Installation - Gasholders London - FRENER & REIFER
Gasholders London

Gasholders London

Location

London, UK

Architect

WilkinsonEyre

Data

Overall Project Time
2015 - 2017

Execution Period:
09.2014 - 03.2017

The elegant building envelope for Gasholders London is being completely planned, manufactured and installed by FRENER & REIFER.

Scope of work

  • Unitised facades with front-mounted sheet metal facades
  • Motorised concertina blinds integrated into façade
  • Sliding doors to balconies
  • Steel balconies with glass balustrades and suspended ceiling panels
  • Fire-rated facades with brass features in inner atrium
  • Glass roofs with smoke extraction system
  • Connecting bridges between the three inner atrium buildings
  • Courtyard facades to connecting bridges and apartments
  • Glazed courtyards to roof terraces
  • Motorised sliding roofs
  • Entrance facade with canopy
  • Shop facades at Ground Floor

Innovations / Challenges

  • Integration of concertina blinds with very high requirements re sustainability, resilience and appearance of the mechanical system
  • Extremely short execution period for completion of building envelope
  • Complex site logistics due to simultaneous installation of cast iron columns by others.
  • BIM design model

» more project information
 