Overall Project Time:
2007 – 2008

Execution Period:
14 Months

Scope of work

  • 7,500m2 thermally broken large format aluminium-module facade (element size 3,600 / 3,800 mm x 4,320 mm).
  • 1,100 m2 double façade.
  • 5,500 mm high ground floor special facade as mixed mullion/transom construction in aluminium and stainless steel.
  • Approx. 2,500 m2 intelligent light deflection system as bespoke sun protection systems construction with horizontal aluminium louvres.
  • All facades in triple glazing. Draft prevention system.
  • Roof lights.

Innovations / Challenges

  • Automatically adjustable, louvred aluminium sun protection system, format 3,600 mm x 4,320 mm.
  • Glazed building apex.
  • Disinfectant-resistant surfaces.