“10 Hills Place“, Office Renovation
Location
London, UKArchitect
Future SystemsLondon, UK
Data
Overall Project Time:2007 – 2008
Execution Period:
9 Months
Scope of work
- 550 m2 glass and metal construction for the office facade.
Innovations / Challenges
- Development and realisation of the 3-dimensionally curved facade sheet cladding.
- Connection between facade and glass ”eye” with polished stainless steel edging, glass fins.