PROJECT

Office Building Dockland,
Hamburg, Germany

SCOPE OF WORK

Double façade (main/secondary façade), sheet metal surrounds. Inclined west and top floor façades. Entrance doors, glass balustrades. Sun/glare protection systems.

INNOVATIONS
AND CHALLENGES

West façade projecting 40m over the Elbe. Exposed position on the Elbe with special challenges regarding corrosion protection. Development of the forced ventilation for the double façade.

DATA

Overall Project Time:
2004-2005
Execution Period:
12 Months
ARCHITECT   BRT - Bothe Richter Teherani, Hamburg, Germany

Architecture team, founded in 1991. BRT stands for city-moulding and identity-forming architecture. Creative pieces full of structural bravura …. BRT moti-vation: “Curiosity inspires every step" (Goethe) BRT credo: “Architecture is sensuality given form" (Goethe would have liked that too)

Selected Awards

www.brt.de
DE gb it fr ru
FRENER & REIFER
FRENER & REIFER
Metallbau GmbH /Srl
Via Alfred Ammon Straße 31
39042 Brixen / Bressanone
Italy

tel +39 - 0472 270 111
fax +39 - 0472 270 170
info@frener-reifer.com
www.frener-reifer.com