High-Rise Office Building Dellbrück-Haus,
Berlin, Germany
SCOPE OF WORK
Custom-built door and windowelements, with high-gloss-finish stainless steel frames on the ground floor, and stainless steel effect on the first floor.
INNOVATIONS
AND CHALLENGES
The surface quenching and tempering of the high-gloss-finish stainless steel façings, including handling.
DATA
Overall Project Time:
2001-2002
Execution Period:
6 Months
A doyen of German architecture. Studies with Egon Eiermann, apprenticeship with Mathias Ungers. Own practice since 1978. Professor at the Swiss Technical High School, Zurich since 1990. Architecture committed to the conventions of the European and American city. Affinities with the Amsterdam School and twentieth century Italian architecture.
www.kollhoff.de