PROJECT

Bavarian State Bank,
Munich, Germany

SCOPE OF WORK

Photovoltaic system integrated into the glazing. Glass double façade with pointfixed rotary bearings. Metal pillar cladding, windows.Heated façade, entrance systems, stainless steel work.

INNOVATIONS
AND CHALLENGES

538 m² photovoltaic area with wide variety of applications:
• SG façade,
• Glass sail,
• Glazed connecting corridor,
• Sun/glare protection system,
• Courtyard façade.

DATA

Overall Project Time:
1998-2000
Execution Period:
20 Months
ARCHITECT   Stiebale Architekten, Munich, Germany

DE gb it fr ru
FRENER & REIFER
FRENER & REIFER
Metallbau GmbH /Srl
Via Alfred Ammon Straße 31
39042 Brixen / Bressanone
Italy

tel +39 - 0472 270 111
fax +39 - 0472 270 170
info@frener-reifer.com
www.frener-reifer.com